What are the installation requirements for traditional Chinese medicine pulverizers?
Date:2020-04-23
1. The machine should be installed in a relatively flat and convenient place.
2. Before work, the processed materials should be selected cleanly, and hard substances such as metal objects and stones should not be mixed into the machine to avoid damage to the parts in the machine or failure.
3. Check whether the parts are firm and reliable before starting. Everything is working properly.
4. Turn on the power, idle for 1-2 minutes, check whether the operation is normal, and everything is normal before feeding. When the machine is working, the operator cannot leave, and once the sound is abnormal, the power should be disconnected immediately. When processing raw materials, the outlet should be tied securely with a longer cloth pocket.
5. If the machine encounters too low power supply voltage when using it, please do not use it to avoid damage to the motor. When the power supply voltage is normal, the machine is not easy to be damaged, and the production efficiency is also high. The hammer mill body vibrated violently during the test operation, and the reason and treatment method were:
(1) The hammer plate device is wrong in the maintenance and disassembly. When the hammer blade is used to change the face and turn around, in order to avoid the balance of the rotor component, all the hammer blades in the pulverizer must be changed and turned around together, otherwise there will be violent vibration during operation.
(2) The difference in the amount of the corresponding two groups of hammer pieces exceeds 5 grams. The method of sweeping is to adjust the amount of hammer blades so that the difference between the corresponding two components is less than 5 grams.
(3) Generally, the hammer blade is stuck too tightly and does not shake off during operation. After stopping, you can turn it by hand to inspect, and find a way to make the hammer blade rotate sensitively.
(4) The components of other parts on the rotor are unbalanced. At this time, the need to identify carefully examines the adjustment equilibrium.
(5) Spindle bending deformation. The method of treatment is straightening or changing.
(6) The clearance of the bearing (product provided: ball bearing) exceeds the limit or is damaged. Generally, new bearings are used to deal with problems.
(7) The bottom corner fixing nut is not fixed tightly or loose during operation. The method of treatment is fastening.
Key words:
Related News
Huili Technology Shines 64th (Spring 2024) National Pharmaceutical Machine Exhibition
2024-05-31
The national pharmaceutical machinery exhibition ended, Huili equipment became one of the highlights
2023-05-31
2020-07-13